Off cuts, padding, pads - mix
Off cuts, padding, pads - mix
- Product Code: U3090
- Delivery Time: 10 - 15 working days
- Brand: Seqo
- Model: mix
- Weight: 29.00kg
Off cuts, padding, pads - mix
Weight: 29kg
The set includes pads in lengths less than 30 cm in various sizes, including:
- 72 × 11 mm
- 80 × 20 mm
- 92 × 20 mm
- 85 × 13 mm
- 140 × 25 mm
The kit can be modified. When placing an order, please specify what thicknesses or lengths of the washers should prevail, if there is no information, the content of the package is selected randomly.
The pads are perfect for installing doors, windows, floors and terraces. They can also be cut easily and are very durable.
Brand: Seqo
Model: S0
Delivery Time: 10 - 15 working days
The S0 overlay is used to support ceramic, concrete or stone tiles larger than 60 × 60 cm.
An overlay is required for each bracket model. The brackets are not fitted with caps at the factory..
Brand: Seqo
Model: Sp07
Delivery Time: 10 - 15 working days
Mounting Profile and Screw (3 Pcs) Sp07 is a practical set designed to securely fix compatible cladding or panel systems in place.
Properties
Provides a secure and stable installation
Ideal for use with façade or cladding systems
Dimensions: 1800 × 27.9 × 19.5 mm
Easy to install with ..
Brand: Seqo
Model: S35
Delivery Time: 10 - 15 working days
Bracket Extension S35 (35 mm) A practical sleeve extension designed to increase the height of mounting brackets. Properties Height: 35 mm Modular design: extensions can be stacked to reach the desired height Durable construction for stable support Easy to install and adjust..
Brand: Seqo
Model: BB-110H16
Delivery Time: 10 - 15 working days More options available
Full Composite Trailer BB-110H16 is a durable wood grain composite railing board designed for strength, style, and longevity. It provides a natural wood-like appearance while offering the benefits of composite material, including low maintenance and resistance to weathering.
Properties
Full ..
Brand: Seqo
Model: Foundation Support
Delivery Time: 10 - 15 working days
Foundation system - does not require concrete, which reduces the costs and time of installing the terrace, is environmentally friendly.
The foundation system includes:
Foundation bolt
Foundation bracket..